For each transport with the transport box (with a hub height of approx. 100 m) approx. 20 min. (10 min downwards / 10 min. Upwards) are needed.
Without KEV, a service team achieves a daily output of 1.5 wind turbines.
With KEV, a service team achieves a daily output of 2 wind turbines. As a result, an additional startup of the wind turbine is no longer necessary.